Projects
EGNATIA ODOS SECTION 5.1: POLYMILOS - LEFKOPETRA
Project's Description
2,300m long double lane tunnel at Polymylos. The tunnel was designed in collaboration with Edafomichaniki S.A. The above mentioned firm designed the temporary excavation works while Helliniki Meletitiki designed the final lining.
Project's Details
- Client: EGNATIA ODOS S.A.
- Design stages: Detailed Design (Final Stage)
- Budget (Structural): 79,236,977 €
- Design period:02/1999 - 05/2000
- Project Stage: Completed
- Geotechnical - Temporary Works: Edafomichaniki S.A.