Projects
MAKRYGIALOS GRADE SEPARATED JUNCTION   
Project's Description

Makrygialos project - grade separated junction design - includes:

- Reinforced concrete bridge of 17m long span. and 40m horizontal width.
Type of strucure: Sandwich Slab with circular gaps.
- High-rise reinforced concrete retaining walls required for the construction of the entrance and exit due to very high fill (12m)
- Pile walls for the retaining of the fill.

The client was he construction contractor (DYNAMIKI S.A.) in collaboration with KARANIKOLAS & PARTNERS Structural Design Office.

 

 

Project's Details
  • Client :  MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING & PUBLIC WORKS - DYNAMIKI S.A.
  • Design stages :   Detailed design (final stage)
  • Budget (Structural) : 2.522.248 €
  • Design period :  09/2000 - 12/2000
  • Project State : Completed