DESIGN FOR THE RELOCATION OF THE RAILWAY TRUCK BETWEEN IASMOS-POLYANTHOS AND KOMPSATOS BRIDGE
Project's Description

Pre-study (includes the complete structural analysis) of the new railway bridge at Kompsatos river, that is transferred due to the construction of the new high speed line. Our work included also the detailed design for the strengthening of the pile foundation of the existing Kompsatos bridge and the preliminary design of smaller single span bridges. The strengthening of the existing bridge was the first goal of this project in order to keep it operable until the construction of the new Kompsatos bridge.

 

 

Project's Details
  • Client :OSE S.A.
  • Design stages : Preliminary and Pre-study
  • Design Period :11/2003 - 07/2013
  • Transport Design:  Ch. Alimpertis - I. Mazis
  • Enviromental Design: Edafomichaniki - Erevnitiki S.A.
  • Geotechnical: Edafomichaniki - Erevnitiki S.A.