Projects
EGNATIA ODOS: G5 BRIDGE OF THE 4.125 SECTION (PANAGIA - GREVENA)
Project's Description
Egnatia highway dual-carriageway bridge. The bridge comprises of 3 spans with a total length of 111.50m for the first carriageway and 2 spans and total length of 73.50m for the second carriageway respectively. Superstructure with prefabricated pretensioned beams with a reinforced concrete slab deck.
Project's Details
- Client : EGNATIA ODOS
- Design stages : Detailed design (final stage)
- Budget (Structural) :3,000,000.00 €
- Design period : 12/2002 - 09/2004