DEWATERED SLUDGE THERMAL DRYING UNIT IN THESSALONIKI   
Project's Description

Structural design for various establishments in this dewatered sludge treatment plant was performed. Most important of all, the main drying unit, is a steel 19m high building, 35 X 25 m in plan, with heavy equipment loads and overhead traveling cranes. The rest of the structures include SILO's foundation and steel supporting system, various liguid tanks, a steel bridge for pipeline support e.t.c. All the projects have been designed and positioned according to the electromechanical requirements of the tender documents.

Note: the above pictures are taken from an equivalent project in Psitalia, Atiki.

 

 

Project's Details
  • Client: J/V AKTOR S.A. – ETETH S.A. / MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING & PUBLIC WORKS
  • Design stages: Scheme design
  • Budget (Structural): -
  • Design period: 07/2008 – 11/2008
  • Project State: The tender was cancelled
  • Architectural Design: Vasilios Adaloglou
  • E/M Design: MELCON Engineering