Projects
PTOLEMAIDA V LIGNITE UNIT BOILER HOUSE
Project's Description
Our scope was related to the boiler house, part of a new lignite unit at Ptolemaida with a capacity of 550-660 MWel, burning pulverized lignite and with the capability of providing up to 140 MWth for district heating (Ptolemaida V)
More specifically we were involved in the design of the cladding and roof sandwich panels and their support on the cold formed steel secondary structure.
Project's Details
- Client: ANEGERSI G. TSAROUXAS O.E.
- Design Stages: Detailed Design
- Budget (Structural): 1.4 billion €
- Design Period: 11/2017 - now
- Project State: Under Construction