NEW WING AT THE MITILINI GENERAL HOSPITAL ("VOSTANIO")
Project's Description
Reinforced concrete Medical and Intensive care units, by extension of the existing building, covering a total area of 4,500m².
Structural design in collaboration with A. & P. FOTIADIS - DOMIKI MELETITIKI Ltd (L. PANTALEON)
Due to lack of funding, after the approval of the preliminary design for the whole project, the unified scheme-detailed design stage was divided in two separate implementation phases. Phase 1 includes the new building N1 and the biological treatment unit, whereas the 2nd phase is the new building N2. The latter consists of 4 independent structures.
Project's Details
- Client: MITILINI GENERAL HOSPITAL ("VOSTANIO") - MINISTRY OF HEALTH & WELFARE
- Design Stages: Preliminary, Scheme and Detailed Design and preparation of Tender documents in two phases
- Budget (Structural): 1,850,000 €
- Design Period: 03/2000 - 05/2004 - 10/2010
- Project State: Construction completed
- Architectural Design: BETAPLAN S.A. - T. Gavrilis & Partners
- MEP Design: ALKON Meletitiki Ltd - G. Sfetsos