Projects
EXTENSION OF AMALIADA GENERAL HOSPITAL
Project's Description
Addition of a new two-storey reinforced concrete wing with one basement floor as extension of the existing hospital building. Collaboration with d. Kokas during all structural design stages.
Project's Details
- Client : MINISTRY OF HEALTH AND WELFARE/ AMALIADA HOSPITAL
- Design Stages :Preliminary and Scheme Design for the Ministry of Health and Welfare. Detailed Design for the contractor J/V A. Economou - N. Korkoli
- Budget (Structural): 560,850 €
- Design Period: 2002 – 2003
- Project State: Completed
- Architectural Design: D. Antonopoulou - E. Raikou Stavrou
- MEP Design: TEHM LTD