Projects
NEW REGENCY CASINO MONT PARNES COMPLEX: UPPER AND LOWER TERMINAL STATIONS AND FUNITEL PYLONS  
Project's Description

Reinforced concrete terminal buildings for the upper and lower stations, secondary steel structures, pylons and special steel constructions, mainly at the upper and lower stations. Collaboration with DOPPELMAYR as for the design loads from the ropeway system.

 

 

Project's Details
  • Client: HELLENIC CASINO MONT PARNES
  • Design stages: Preliminary, Scheme, Detailed - Construction Design Phase
  • Budget (Structural): -
  • Design period: 23/06/2004 – 30/05/2005
  • Project State: Completed
  • Architectural Design: P. MASOURIDIS
  • E/M Design: L.D.K. TECHNICAL & DEVELOPMENT PROJECTS CONSULTANTS Ltd. / AKTER Ltd.