Projects
MULTI-PURPOSE SPORTS CENTER IN PERISTERI (MAZARAKIS ESTATE)
Project's Description

Steel structure with long spans, supported on 4 mega columns using seismic isolation at the top of the columns.

Project's Details
  • Client: AKTOR S.A. / GENERAL SECRETARIAT OF SPORTS - GENERAL DIRETCORATE OF THE MINISTRY OF SPORTS
  • Design stages: Scheme Design (Tender Study)
  • Budget (Structural): 13,206,163 €
  • Design period: 10/2002 – 27/11/2002
  • Project State:Completed (The detailed design was carried out by another office)
  • Architectural Design: Vetaplan S.A.
  • MEP Design: Electromechanologiki TETRAS LTD.