The complete project was assigned under 3 contracts (A.D. 258,396 and 396A). More precisely, it comprises:

  • Steel building for the inspection of electric wagons, connected with a reinforced concrete (EMU) office-workshop building
  • Steel building for the stabling of the suburban electric wagons (STABLING) 39.4m wide and 190m long
  • Car wash, lathe, warehouse buildings and OCM pedestrian bridge of the same span as the STABLING
  • The contracts 258 and 396 concerned the scheme design and the tender documents, while the contract 396A involved the building permit design.



    Project's Details 
    • Client: ERGA OSE S.A. - OSE S.A.
    • Design Stages: Preliminary, Scheme and Building Permit Design - Preparation of Tender documents
    • Budget (Structural): 6,759,000 €
    • Design Period: 2001-2009
    • Project State: Not out to tender yet  
    • Architectural Design: X. Kalaitzis - V. Sitarenios - N. Stratigeas & Partners ANAPLASI Co
    • MEP Design: Co Elxis S.A. / Empeiria S.A.